{"id":14340,"date":"2020-02-12T16:16:53","date_gmt":"2020-02-12T16:16:53","guid":{"rendered":"https:\/\/oxfordcorp.com\/?p=14340"},"modified":"2023-10-12T21:09:48","modified_gmt":"2023-10-12T21:09:48","slug":"full-facility-validation-in-eleven-months-months","status":"publish","type":"post","link":"https:\/\/www.oxfordcorp.com\/nl\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/","title":{"rendered":"Full Facility Validation in Eleven Months"},"content":{"rendered":"<p><em>Discover how Oxford helped a pharmaceutical manufacturer open a fully validated facility within eleven months.\u00a0<\/em><\/p>\n<p><strong>INDUSTRY<\/strong><br \/>\nPharmaceuticals<\/p>\n<p><strong>SERVICES<\/strong><br \/>\nCommissioning &amp; Qualification<br \/>\nValidation<br \/>\nFacility Set-Up &amp; Inspection<\/p>\n<p><strong>SKILLS<\/strong><br \/>\nValidation Plan<br \/>\nDevelopment<\/p>\n<p><strong>The Challenge<\/strong><br \/>\nA pharmaceutical manufacturer was facing a challenge: to open a new facility and achieve full validation \u2014 from equipment to processes, within the course of a year. However, a lack of resources and a small in-house validation team was hindering their progress. As a result, they decided to seek outside assistance to help them achieve their goals. After vetting several organizations, the client chose Oxford Global Resources to provide the talent they needed due to our proven ability to partner with them and source talent in a short timeframe.<\/p>\n<p><strong>The Solution<\/strong><br \/>\nAfter an initial review of the project plan, equipment, and current processes with the client we were able to fully understand the needs of the initiative and provide a comprehensive, customized solution. From there, we established a resource plan to serve the needs of the client and ensure all aspects of the project were addressed.<\/p>\n<p>To increase efficiency and streamline efforts, the project was divided into three phases. The first phase included writing and execution of protocols for various pieces of equipment which included qualification, cleaning verification, and process verification. The second phase involved validating existing equipment, performing cleaning verifications, and process validations for media fill operations. Because the existing facility was being renovated for the client\u2019s use, this included existing equipment re-qualifications and new equipment qualifications. The final phase of the initiative involved validating lab equipment, HVAC system, ISO class 5 and 7 room classifications, and final processes.<\/p>\n<p>It was determined that seven consultants total would be required to get the new facility operational. This team of consultants included a Subject Matter Expert, Project Manager, Validation Engineers, Equipment Engineers, Technical Writers, and QA Support. Through their combined efforts, the following expertise was provided:<\/p>\n<ul>\n<li>Engineering Reviews<\/li>\n<li>Technical Writing<\/li>\n<li>Redevelopment of Work Instructions<\/li>\n<li>Overall Equipment and Process Validation<\/li>\n<li>Quality Assurance<\/li>\n<li>Factory Acceptance Testing<\/li>\n<li>Equipment Setup<\/li>\n<\/ul>\n<p><strong>The Result<\/strong><br \/>\nAlthough the expected duration of the project was a full 12 months, our Oxford team was able to help the client achieve full facility validation in 11 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Discover how Oxford helped a pharmaceutical manufacturer open a fully validated facility within eleven months.\u00a0 INDUSTRY Pharmaceuticals SERVICES Commissioning &amp; [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":22217,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[181],"tags":[113],"category-tag":[],"class_list":["post-14340","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-study","tag-life-sciences"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Full Facility Validation in Eleven Months - Oxford Global Resources<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.oxfordcorp.com\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Full Facility Validation in Eleven Months\" \/>\n<meta property=\"og:description\" content=\"Discover how Oxford helped a pharmaceutical manufacturer open a fully validated facility within eleven months.\u00a0 INDUSTRY Pharmaceuticals SERVICES Commissioning &amp; [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/\" \/>\n<meta property=\"og:site_name\" content=\"Oxford Global Resources\" \/>\n<meta property=\"article:published_time\" content=\"2020-02-12T16:16:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-12T21:09:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Luke Summers\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luke Summers\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/\"},\"author\":{\"name\":\"Luke Summers\",\"@id\":\"https:\/\/www.oxfordcorp.com\/de\/#\/schema\/person\/e880f6edc6bcf421204f294431943cd3\"},\"headline\":\"Full Facility Validation in Eleven Months\",\"datePublished\":\"2020-02-12T16:16:53+00:00\",\"dateModified\":\"2023-10-12T21:09:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/\"},\"wordCount\":369,\"image\":{\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg\",\"keywords\":[\"Life Sciences\"],\"articleSection\":[\"Case Study\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/\",\"url\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/\",\"name\":\"Full Facility Validation in Eleven Months - Oxford Global Resources\",\"isPartOf\":{\"@id\":\"https:\/\/www.oxfordcorp.com\/de\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg\",\"datePublished\":\"2020-02-12T16:16:53+00:00\",\"dateModified\":\"2023-10-12T21:09:48+00:00\",\"author\":{\"@id\":\"https:\/\/www.oxfordcorp.com\/de\/#\/schema\/person\/e880f6edc6bcf421204f294431943cd3\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#primaryimage\",\"url\":\"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg\",\"contentUrl\":\"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg\",\"width\":1600,\"height\":1067,\"caption\":\"full team for audit management resized scaled\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.oxfordcorp.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Full Facility Validation in Eleven Months\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.oxfordcorp.com\/de\/#website\",\"url\":\"https:\/\/www.oxfordcorp.com\/de\/\",\"name\":\"Oxford Global Resources\",\"description\":\"Global\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.oxfordcorp.com\/de\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.oxfordcorp.com\/de\/#\/schema\/person\/e880f6edc6bcf421204f294431943cd3\",\"name\":\"Luke Summers\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\/\/www.oxfordcorp.com\/de\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3d7d4c9724f33e3a19ac78af573b29ed6164c2ceffe51f72aff7df98b279e3de?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3d7d4c9724f33e3a19ac78af573b29ed6164c2ceffe51f72aff7df98b279e3de?s=96&d=mm&r=g\",\"caption\":\"Luke Summers\"},\"url\":\"https:\/\/www.oxfordcorp.com\/nl\/insights\/author\/lsummersthiel-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Full Facility Validation in Eleven Months - Oxford Global Resources","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.oxfordcorp.com\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/","og_locale":"nl_NL","og_type":"article","og_title":"Full Facility Validation in Eleven Months","og_description":"Discover how Oxford helped a pharmaceutical manufacturer open a fully validated facility within eleven months.\u00a0 INDUSTRY Pharmaceuticals SERVICES Commissioning &amp; [&hellip;]","og_url":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/","og_site_name":"Oxford Global Resources","article_published_time":"2020-02-12T16:16:53+00:00","article_modified_time":"2023-10-12T21:09:48+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg","type":"image\/jpeg"}],"author":"Luke Summers","twitter_card":"summary_large_image","twitter_misc":{"Geschreven door":"Luke Summers","Geschatte leestijd":"2 minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#article","isPartOf":{"@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/"},"author":{"name":"Luke Summers","@id":"https:\/\/www.oxfordcorp.com\/de\/#\/schema\/person\/e880f6edc6bcf421204f294431943cd3"},"headline":"Full Facility Validation in Eleven Months","datePublished":"2020-02-12T16:16:53+00:00","dateModified":"2023-10-12T21:09:48+00:00","mainEntityOfPage":{"@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/"},"wordCount":369,"image":{"@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#primaryimage"},"thumbnailUrl":"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg","keywords":["Life Sciences"],"articleSection":["Case Study"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/","url":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/","name":"Full Facility Validation in Eleven Months - Oxford Global Resources","isPartOf":{"@id":"https:\/\/www.oxfordcorp.com\/de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#primaryimage"},"image":{"@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#primaryimage"},"thumbnailUrl":"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg","datePublished":"2020-02-12T16:16:53+00:00","dateModified":"2023-10-12T21:09:48+00:00","author":{"@id":"https:\/\/www.oxfordcorp.com\/de\/#\/schema\/person\/e880f6edc6bcf421204f294431943cd3"},"breadcrumb":{"@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#primaryimage","url":"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg","contentUrl":"https:\/\/www.oxfordcorp.com\/wp-content\/uploads\/2020\/02\/full_team_for_audit_management_resized-scaled.jpg","width":1600,"height":1067,"caption":"full team for audit management resized scaled"},{"@type":"BreadcrumbList","@id":"https:\/\/www.oxfordcorp.com\/nl-d\/insights\/case-study\/full-facility-validation-in-eleven-months-months\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.oxfordcorp.com\/"},{"@type":"ListItem","position":2,"name":"Full Facility Validation in Eleven Months"}]},{"@type":"WebSite","@id":"https:\/\/www.oxfordcorp.com\/de\/#website","url":"https:\/\/www.oxfordcorp.com\/de\/","name":"Oxford Global Resources","description":"Global","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.oxfordcorp.com\/de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Person","@id":"https:\/\/www.oxfordcorp.com\/de\/#\/schema\/person\/e880f6edc6bcf421204f294431943cd3","name":"Luke Summers","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/www.oxfordcorp.com\/de\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3d7d4c9724f33e3a19ac78af573b29ed6164c2ceffe51f72aff7df98b279e3de?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3d7d4c9724f33e3a19ac78af573b29ed6164c2ceffe51f72aff7df98b279e3de?s=96&d=mm&r=g","caption":"Luke Summers"},"url":"https:\/\/www.oxfordcorp.com\/nl\/insights\/author\/lsummersthiel-com\/"}]}},"_links":{"self":[{"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/posts\/14340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/comments?post=14340"}],"version-history":[{"count":0,"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/posts\/14340\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/media\/22217"}],"wp:attachment":[{"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/media?parent=14340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/categories?post=14340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/tags?post=14340"},{"taxonomy":"category-tag","embeddable":true,"href":"https:\/\/www.oxfordcorp.com\/nl\/wp-json\/wp\/v2\/category-tag?post=14340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}